Challenge
We were required to completely refurbish a system we manufactured a decade previously, within tight timescales, to ‘as new’ condition.
Solution
Working closely with key suppliers to ensure critical components arrived on time, we replaced sixteen 50 litre bladder accumulators, and eight accumulator safety blocks. We serviced and repaired four air-driven liquid pumps and recalibrated all the system’s pressure relief valves. We conducted a function and leak test of the entire system, replaced and repaired damaged panels and touched up any damaged paintwork.