Tank Capacity | 2800 litres (100% capacity) 304 SS |
---|---|
Electrical Requirements | 380/480V, 3 phase, 50/60Hz |
Ports | 2x 4” ANSI 150lb (can be modified to client requirements) |
Heaters | 4x 11kW, mild steel elements (other element material available on request) |
Fluid Type | Hydraulic oil, glycol, other fluids available on request |
Instrumentation | Analogue temperature gauge, Sight level gauge |
Control Panel | Mains isolator, 4x heater on/off |
Thermal Protection | Insulated tank cover |
Safety Features | Low level shutdown, Emergency stop button |
Deck Cable | 30 metre (when new) |
Moving & Handling | DNV 2.7-3 certified frame, 4-leg certified sling set, Forklift pockets |
Dimensions | 2500mm (L) x 1500mm (W) x 2000mm (H) |
Weight | Gross 4500 kg |
- Home
- Rental Equipment
- Flushing Equipment
- Heated Tank Flushing Unit - Atex Zone 1
Heated Tank Flushing Unit - Atex Zone 1
Enquire about this product
Complete the below form, and we will get back to you as soon as possible
-
-
From concept to design and manufacture we develop equipment which is safer, more efficient and cost effective than any other.
We are proud of our bespoke concept, design and manufacture service, one being our heated tank. Our teams of technical experts design our equipment with the user in mind and this piece of equipment is ideal for demanding applications such as:
- Hot oil flushing
- Chemical cleaning both on and offshore.
We consider every aspect of your project from space accessibility to operational integrity and time constraints. Our teams of professionals will work with you to establish the best solutions, while also offering a bespoke modification service, to ensure your unique project receives the right package to meet your needs anywhere in the world.
-
Related case studies
Latest news
-
Applications open for Apprenticeships
25 July 2024 -
Brimmond's Got Talent: how we foster a culture of continuous learning & development
11 July 2024 -
Brimmond refurbish & inspection service
27 June 2024 -
Successful event at Seawork for Brimmond
17 June 2024 -
Brimmond charitable efforts step up a gear to help everyone get on their bikes
13 June 2024 -
Maintaining safety and reliability of marine cranes with Brimmond’s refurbishment service
11 June 2024