Motor Type | ABB thermostatically protected 30/35kW motor (2of) |
---|---|
Electrical Requirements | 380 - 480V, 3 Phase, 50/60Hz |
Starter | Star Delta |
Pump Type | Single stage long coupled (2of) |
Pump Features | 316 stainless steel casing, casing cover and impeller |
Pump Output (Per Pump) | 43 m3/hour, 5.7 bar @ 50Hz, 50 m3/hour, 8.3 bar at 60Hz |
Seal Type | Eagle Burgmann single unbalanced chemical seal |
Connections | 2x Inlet – 4” Fig 206 Female Hammer Lug Union, 2x Outlet – 4” Fig 206 Male Hammer Lug Union, additional options available on request |
Control Panel | Mains isolator, emergency stop button, start/stop push buttons |
Deck Cable | 30 metre (when new) |
Moving & Handling | 30 metre (when new) |
Dimensions | 2500mm (L) x 1260mm (W) x 1840mm (H) |
Weight | Gross 3500 kg |
- Home
- Rental Equipment
- Pump Packages
- Electrically Driven Twin Centrifugal Pump – Atex Zone 1
Electrically Driven Twin Centrifugal Pump – Atex Zone 1
Enquire about this product
Complete the below form, and we will get back to you as soon as possible
-
-
At Brimmond Group we work across a wide range of sectors including energy, oil and gas, renewables, decommissioning, marine and construction.
We pride ourselves on our ability to ensure our equipment is safer, more maintenance friendly and more efficient than many on the market. Our range of heavy duty centrifugal pumps are no different. They are ideal for demanding applications handling water, chemicals and hydrocarbons. They can be used either onshore or offshore to carry out:
- Well testing operations
- Chemical pickling and passivating
- Chemical flushing
- High flow low pressure fluid transfer.
With the twin centrifugal pump we can offer a duty and standby to ensure no time is lost due to maintenance or equipment failure.
On it's own or as part of a unique Brimmond Group package our employees will happily help ensure you receive the product and service you require for your project.
-
Related case studies
Latest news
-
Stevie celebrates 15 years at Brimmond!
20 November 2023 -
Brimmond's new fabrication extension opens thanks to ETZ
12 October 2023 -
Team Brimmond take on the Banchory Beast and raise £3,000 for Charlie House charity
6 October 2023 -
Brimmond team travel to Middle East for ADIPEC event
5 October 2023 -
Offshore Europe success for Team Brimmond
14 September 2023 -
Brimmond granted coveted Fit4Offshore Renewables status
3 September 2023