Motor Type | WEG thermostatically protected 36kW motor |
---|---|
Electrical Requirements | 380 - 440V, 3 Phase, 50/60Hz |
Starter | Star Delta |
Pump Type | Single stage close coupled |
Pump Features | 316 stainless steel casing, casing cover and impeller |
Pump Output | 43 m3/hour, 5.9 bar @ 50Hz, 50 m3/hour, 8.4 bar @ 60Hz |
Seal Type | Eagle Burgmann single unbalanced chemical seal |
Connections | Inlet – 4” Fig 206 Female Hammer Lug Union, Outlet – 4” Fig 206 Male Hammer Lug Union, additional options available on request |
Control Panel | Mains isolator, emergency stop button, start/stop push buttons |
Deck Cable | 30 metre (when new) |
Moving & Handling | DNV 2.7-1/EN12079 certified frame, 4-leg certified sling set, forklift pockets |
Dimensions | 1260mm (L) x 1030mm (W) x 1230mm (H) |
Weight | Gross 1200 kg |
- Home
- Rental Equipment
- Pump Packages
- Electrically Driven Centrifugal Pump – Atex Zone 1
Electrically Driven Centrifugal Pump – Atex Zone 1
Enquire about this product
Complete the below form, and we will get back to you as soon as possible
-
-
At Brimmond Group we work across a wide range of sectors including energy, oil and gas, renewables, decommissioning, marine and construction.
We pride ourselves on our ability to ensure our equipment is safer, more maintenance friendly and more efficient than many on the market. Our range of heavy duty centrifugal pumps are no different, and are ideal for demanding applications including handling water, chemicals and hydrocarbons. They can be used either onshore or offshore to carry out:
- Well testing operations
- Chemical pickling
- Chemical flushing
- Tank emptying.
On it's own or as part of a unique Brimmond Group package our employees will happily help ensure you receive the product and service you require for your project.
-
Related case studies
Latest news
-
Three new job vacancies
13 November 2024 -
Brimmond exhibit at the world's largest energy exhibition in Abu Dhabi
31 October 2024 -
Brimmond secures 5-year service contract with British Antarctic Survey vessel
25 October 2024 -
Independent survey reveals 91% of Brimmond employees say it’s a ‘Great Place to Work’
21 October 2024 -
Marine cranes division plays key role in boosting turnover
23 August 2024 -
Team Brimmond try Bowls!
23 August 2024