Motor Type | Brook Crompton Exde thermostatically protected motor |
---|---|
Electrical Requirements | 380 - 480V, 3 Phase, 50/60Hz (45kW at 50Hz / 52kW at 60Hz) |
Starter | Star Delta |
Pump Type | Kawasaki variable displacement piston pump |
Pump Output (maximum) | 80cc: 140lpm, 320 Bar; 112cc: 190lpm, 320 Bar |
Filtration | 90 micron suction, 3 micron pressure and 20 micron return (as standard, others available on request) |
Oil Tank Capacity | 460 litre |
Oil Type | ISO 32 as standard, others on request |
Hydraulic Connections | Quick release couplings (client specified type) Pressure: 1” NPT Female; Return: 1 1/4” NPT Female; Case Drain: 3/4” NPT Female |
Cooler | Air blast cooler c/w thermostatically controlled diverter valve |
Control Panel | Mains isolator, Emergency stop button, Start/stop push buttons, Phase reversal indicator, High temp cut off indicator & Low oil cut off indicator |
Deck Cable | 40 metre (when new) 4 Core 25mm^2, 3P+ |
Remote Emergency Stop | 40 metre (when new) |
Moving & Handling | DNV 2.7-1 or DNV 2.7-3, Type A, Class R60, 4 leg certified sling set Forklift pockets |
Deck Fastening | Sacrificial weld down plates |
Dimensions | 1570mm (L) x 1300mm (W) x 2000mm (H) |
Weight | 3000 kg (gross) |
- Home
- Rental Equipment
- Electrical Hydraulic Power Units
- 45/52kW Electrically Driven Hydraulic Power Unit - Atex Zone 1
45/52kW Electrically Driven Hydraulic Power Unit - Atex Zone 1
Enquire about this product
Complete the below form, and we will get back to you as soon as possible
-
-
Our 45kW electric hydraulic power units can be operated in various environments, including offshore ATEX zone 1 areas.
Our equipment can be engineered to suit your specific needs, and can be used to provide power to equipment such as:
- Spoolers and reels
- Divers tooling
- Cranes
- Winches
- Driven pumps
- Flushing units
At Brimmond Group we develop equipment which is safer and more maintenance friendly than any other. Through our teams’ operational experience, we have developed a range of engineering solutions with the user in mind, while also delivering a more cost effective, time efficient and safer package.
We consider every aspect of your project from space accessibility to operational integrity and time constraints. Our teams of professionals will work with you to establish the best solutions, while also offering a bespoke modification service, to ensure your unique project receives the right package to meet your needs anywhere in the world.
-
Related case studies
Latest news
-
Marine cranes division plays key role in boosting turnover
23 August 2024 -
Team Brimmond try Bowls!
23 August 2024 -
Bumper year for Brimmond as turnover soars by 74% to £11.4m
30 July 2024 -
Applications open for Apprenticeships
25 July 2024 -
Brimmond's Got Talent: how we foster a culture of continuous learning & development
11 July 2024 -
Brimmond refurbish & inspection service
27 June 2024