Motor Type | Brook Crompton Exde thermostatically protected motor |
---|---|
Electrical Requirements | 380/480V, 3 phase, 50/60Hz (22kW @ 50Hz /25kW @ 60Hz) |
Starter | DOL |
Pump Type | Kawasaki variable displacement piston pump |
Pump Output (maximum) | 140 l/min, 320 bar |
Filtration | 90 micron suction, 10 micron return |
Oil Tank Capacity | 50 litre |
Oil Type | ISO 32 as standard, others on request |
Hydraulic Connections | Quick release couplings (client specified type) Pressure: 1” NPT Female; Return: 1 1/4” NPT Female; Case Drain: 3/4” NPT Female |
Cooler | Air blast cooler |
Control Panel | Mains isolator, emergency stop button, start/stop push buttons |
Deck Cable | 30 metre 16mm^2 3P+E (when new |
Moving & Handling | DNV 2.7-1/EN12079 certified frame, 4-leg certified sling set, forklift pockets |
Safety Features | Local E-Stop, Remote E-Stop, Low oil level shutdown, High oil temperature shutdown, Motor thermistor, Pressure relief valve |
Deck Fastening | Sacrificial weld down plates |
Dimensions | 2000mm (L) x 1000mm (W) x 1500mm (H) |
Weight | 3000 kg (gross) |
- Home
- Rental Equipment
- Electrical Hydraulic Power Units
- 25kW Electric Hydraulic Power Unit - Atex Zone 1
25kW Electric Hydraulic Power Unit - Atex Zone 1
Enquire about this product
Complete the below form, and we will get back to you as soon as possible
-
-
Our 25kW electric hydraulic power unit offers our clients the ability to provide hydraulic power to a multiple of projects in diverse working environments including both on and offshore ATEX zoned areas, and can be used to power equipment such as:
- Hydraulic spoolers and reelers
- Subsea and divers tooling
- Mass flow excavation tools
- Cranes and winches
- Subsea excavation equipment
- Hydraulic flushing units.
All of our equipment is developed to be safer and more maintenance friendly than any other. Through our teams’ operational experience, we have developed a range of engineering solutions with the user in mind, while also delivering a more cost effective, time efficient and safer package.
We consider every aspect of your project from space accessibility to operational integrity and time constraints. Our teams of professionals will work with you to establish the best solutions, while also offering a bespoke modification service, to ensure your unique project receives the right package to meet your needs anywhere in the world.
-
Related case studies
Latest news
-
Marine cranes division plays key role in boosting turnover
23 August 2024 -
Team Brimmond try Bowls!
23 August 2024 -
Bumper year for Brimmond as turnover soars by 74% to £11.4m
30 July 2024 -
Applications open for Apprenticeships
25 July 2024 -
Brimmond's Got Talent: how we foster a culture of continuous learning & development
11 July 2024 -
Brimmond refurbish & inspection service
27 June 2024