Motor Type | Brook Crompton thermostatically protected motor |
---|---|
Electrical Requirements | 380 - 480V, 3 Phase, 50/60Hz (55kW at 50Hz / 63kW at 60Hz) |
Starter | Star Delta |
Pump Type | Parker Variable displacement piston pump |
Pump Output (maximum) | 140 l/min, 265 bar |
Filtration | 90 micron suction,6 micron pressure ,10 micron return (as standard, others available on request |
Oil Tank Capacity | 750 litre c/w 2.5kW tank heater |
Oil Type | ISO 32 as standard, others on request |
Hydraulic Connections | Quick release couplings (client specified type) Pressure: 1” NPT Female; Return: 1 1/4” NPT Female; Case Drain: 3/4” NPT Female |
Cooler | Water cooler |
Control Panel | Mains isolator, emergency stop button, start/stop push buttons, high temp cut off indicator, low oil cut off indicator |
Deck Cable | 25 metre (when new) 4 Core 25mm^2, 3P+ |
Remote Emergency Stop | 20 metre (when new) |
Moving & Handling | DNV 2.7-1/EN12079 certified frame, 4-leg certified sling set, forklift pockets |
Safety Features | Local E-Stop, Remote E-Stop, Low oil level shutdown, High oil temperature shutdown, Motor thermistor shutdown, Pressure Relief Valve |
Deck Fastening | Sacrificial weld down plates |
Dimensions | 2000mm (L) x 1500mm (W) x 1870mm (H) |
Weight | 2,750 kg (gross) |
- Home
- Rental Equipment
- Electrical Hydraulic Power Units
- 55/63kW Electric Hydraulic Power Unit - Atex Zone 1
55/63kW Electric Hydraulic Power Unit - Atex Zone 1
Enquire about this product
Complete the below form, and we will get back to you as soon as possible
-
-
Our 55/63kW electrically driven hydraulic power unit can be used in either onshore or offshore ATEX zone 1 environments and can be used to provide hydraulic power to a variety of connected equipment such as:
- Hydraulic spoolers and reelers
- Subsea and divers tooling
- Mass flow excavation tools
- Cranes and winches
- Subsea excavation equipment
- Hydraulic flushing units
Through our teams’ operational experience, we have developed a range of engineering solutions with the user in mind, while also delivering a more cost effective, time efficient and safer package.
We consider every aspect of your project from space accessibility to operational integrity and time constraints. Our teams of professionals will work with you to establish the best solutions, while also offering a bespoke modification service, to ensure your unique project receives the right package to meet your needs anywhere in the world.
-
Related case studies
Latest news
-
Brimmond marks best financial year to date with £10 million turnover projection
26 May 2023 -
Brimmond’s latest acquisition from Charlie House is quite a ‘coo’!
3 April 2023 -
Meet our Apprentices, Dylan and Shaun
6 March 2023 -
Brimmond's Greg raises £4,000 for Alzheimer Scotland
20 February 2023 -
Business Admin Assistant Vacancy
16 February 2023 -
Brimmond strengthens marine crane offering with investment in new stock fleet
20 December 2022